New Connections

Building a new home, granny flat, duplex or commercial property? Glenco connects new builds to the Ausgrid and Endeavour Energy networks, managing the applications, service mains and metering so your power is on when you need it.

Network connections for new builds of any size, by accredited Level 2 electricians.

  • Accredited Level 2 ASP (No. 3898, Classes 2A to 2D)

  • Applications and permission to connect handled for you

  • Power on in around 10 business days

  • Overhead or underground connections

  • Any size, from granny flats to new estates

  • Free quotes

Glenco Level 2 electrician replacing a private power pole, Sydney

What’s Included

Everything to keep your private pole safe, compliant and connected.


Connection application

We lodge and manage the application with Ausgrid or Endeavour Energy.


Consumer mains

New mains cabling from the connection point to your switchboard.


NMI and permission to connect

We can often arrange your NMI on your behalf, then obtain permission to connect from the network.


Metering

New meters, including separate metering for granny flats and multi-dwellings.


Overhead or underground service

We install the service connection to suit how your street is supplied.


Testing and energising

Tested, certified and switched on.

New Connections of Any Size


Homes and granny flats

New homes, knockdown rebuilds and secondary dwellings, including separate metering.


Multiple connections and meters, organised together.

Duplexes and subdivisions


Commercial and industrial builds, new estates and private substations.

Commercial and large developments

When You Need a New Connection

  • Building a new home or knockdown rebuild

  • Adding a granny flat or secondary dwelling with its own meter

  • Building a duplex or subdividing

  • Developing a new estate

  • Commercial and industrial builds

How a New Connection Works

  1. Send us your plans
    We confirm what your site needs.

  2. Application and NMI
    We lodge the application with Ausgrid or Endeavour Energy. Depending on the network, we complete it on your behalf, or guide you through choosing a retailer and getting an NMI.

  3. Permission to connect
    We obtain permission to connect from the network.

  4. Installation
    Service, consumer mains and metering installed.

  5. Power on
    We test, certify and energise your supply.


Allow around 10 business days from application to power on. Using our temporary builders' power? We'll manage the changeover too.

Why Choose Glenco

Accredited and authorised

ASP Level 2 Accreditation No. 3898, Classes 2A to 2D.

Multi-trade experts since 1988

Family-owned, NECA member since 1990 and Master Builders member.

We handle the network

Applications, notifications and bookings with Ausgrid and Endeavour Energy.

One contractor, start to finish

Level 2, general electrical, switchboards and building make-good works.

Private Power Pole FAQs

Related Level 2 Services

Defect Notice Rectification

Overhead & Underground Services

All Level 2 Services

Complete the form with a few details about your project. Our friendly service team will get back to you as soon as possible.

24/7 Emergency Electrician
Call us on 02 9700 9996

Get In Touch