Electrical Defect Notice Repairs Sydney
Accredited Level 2 ASP (No. 3898, Classes 2A to 2D)
Same day for emergencies, 3 to 5 days otherwise
Metering, switchboard, private pole and point of attachment defects
We notify the network so the notice is closed out
Homes, strata and commercial properties
Free quotes
Got a defect notice from Ausgrid or Endeavour Energy? It comes with a deadline, and your power can be disconnected if it isn't fixed in time. Glenco's accredited Level 2 electricians fix the defect and notify the network, so the notice is closed out and you can move on.
Network defect notices fixed and closed out fast, by accredited Level 2 electricians.
Defects We Fix
The most common defects we see, all fixed by one accredited team.
Metering defects
Damaged, non-compliant or poorly positioned meters and meter boards.
Point of attachment
Loose, damaged or low attachment points where the service line meets your building.
Switchboard defects
Unsafe or non-compliant switchboards brought up to standard.
Service line clearances
Overhead lines too low over driveways, roofs or trees, corrected.
Private pole defects
Rotting, leaning or damaged private poles repaired or replaced.
Network notification
Once fixed, we notify the network so your notice is closed out.
A defect notice means the network has found something unsafe or non-compliant on your side of the connection. Each notice has a deadline, and if it isn't fixed in time the network can disconnect your supply. Send us a photo of your notice and we'll tell you what's needed.
Don't Let the Deadline Pass
How Defect Repairs Work
Send us your notice.
A photo is fine. We'll confirm what needs fixing.Free quote.
A fixed price, with the work booked before your deadline.Repair.
Same day for emergencies, usually 3 to 5 days otherwise.Close out.
We test, certify and notify the network so the notice is closed.
Why Choose Glenco
Accredited and authorised
ASP Level 2 Accreditation No. 3898, Classes 2A to 2D.
Multi-trade experts since 1988
Family-owned, NECA member since 1990 and Master Builders member.
We handle the network
Applications, notifications and bookings with Ausgrid and Endeavour Energy.
One contractor, start to finish
Level 2, general electrical, switchboards and building make-good works.
3-Phase Upgrade FAQs
-
A notice from your network, such as Ausgrid or Endeavour Energy, saying something on your side of the connection is unsafe or non-compliant and must be fixed by a set date.
-
The network can disconnect your power until the defect is fixed. Getting it booked early avoids that.
-
Work on the network connection, service line, private pole or metering needs an accredited Level 2 electrician. Glenco can fix those and any general electrical defects too.
-
Same day for emergencies, and usually within 3 to 5 days otherwise.
-
Metering, switchboard, private pole and point of attachment defects.
-
No. We notify them for you so the notice is closed out.
Related Level 2 Services
Private Power Poles
Consumer Mains & Switchboard Upgrades
All Level 2 Services
Complete the form with a few details about your project. Our friendly service team will get back to you as soon as possible.
24/7 Emergency Electrician
Call us on 02 9700 9996