Switchboard & Consumer Mains Upgrades
Older buildings often have consumer mains and switchboards that weren't built for today's power use. Glenco upgrades the mains from the network connection to your switchboard, along with the switchboard and earthing, so your property can safely handle more load.
Mains, switchboard and earthing upgrades for homes, strata and commercial buildings, by accredited Level 2 electricians.
Accredited Level 2 ASP (No. 3898, Classes 2A to 2D)
Mains, switchboard and earthing done together by one team
Strata upgrades in about 2 days, with power back on at the end of each day
Network approvals handled for you
Homes, strata and commercial buildings
Free quotes
What’s Included
One accredited team for everything from the network connection to your switchboard.
Consumer mains upgrade
New mains cabling sized for your building's load, from the connection point to the switchboard.
Strata and multi-unit
Main switchrooms, unit sub-mains and meter panels for strata buildings.
Main switchboard upgrade
Old fuse boards replaced with a modern switchboard, safety switches and room to grow.
Network approvals
We lodge and manage the paperwork with Ausgrid or Endeavour Energy.
Earthing upgrade
Earthing brought up to current standards, recommended with every mains upgrade.
Testing and certification
Tested, certified and handed over with the network notified.
Upgrades Built Around Strata Buildings
We know residents can't be without power for days. Strata mains upgrades usually take about 2 days, and we restore power at the end of each day. Outages are planned and confirmed with your strata manager in advance, with notices for residents.
Signs You Need a Upgrade
Your switchboard still has old ceramic fuses
Power trips when several appliances run at once
You're adding EV chargers, air conditioning or solar
Your building has received a defect notice
You're renovating or adding units
Your strata building's mains are decades old
How a 3-Phase Upgrade Works
Site assessment and free quote
We check your supply and switchboard and give you a fixed price.Network application
We lodge the application with Ausgrid or Endeavour Energy. Approval usually takes 5 to 10 business days.Works scheduled
We book the outage and arrange your new meter.Upgrade
Mains, meter and switchboard are upgraded, usually in 1 to 2 days on site. Your power is only off for part of the day.Test and sign-off
We test, certify and notify the network.
Why Choose Glenco
Accredited and authorised
ASP Level 2 Accreditation No. 3898, Classes 2A to 2D.
Multi-trade experts since 1988
Family-owned, NECA member since 1990 and Master Builders member.
We handle the network
Applications, notifications and bookings with Ausgrid and Endeavour Energy.
One contractor, start to finish
Level 2, general electrical, switchboards and building make-good works.
3-Phase Upgrade FAQs
-
The cables that carry power from the network connection point, such as your pole or pillar, to your main switchboard. They're the property owner's responsibility.
-
We usually recommend upgrading the consumer mains, switchboard and earthing together. It's safer, more cost-effective and means only one outage.
-
For strata buildings, the work usually takes about 2 days, and we restore power at the end of each day. We'll confirm outage times with you before we start.
-
Yes. We plan the work with your strata manager, provide quotes for committee approval and help with notices to residents.
-
We do. We lodge the paperwork with Ausgrid or Endeavour Energy and notify them once the work is complete.
-
No. We can arrange the new meter through your retailer on your behalf, so you don't have to chase anyone.
Related Level 2 Services
3-Phase Power Upgrades
Metering Services
All Level 2 Services
Complete the form with a few details about your project. Our friendly service team will get back to you as soon as possible.
24/7 Emergency Electrician
Call us on 02 9700 9996