Switchboard & Consumer Mains Upgrades

Older buildings often have consumer mains and switchboards that weren't built for today's power use. Glenco upgrades the mains from the network connection to your switchboard, along with the switchboard and earthing, so your property can safely handle more load.

Mains, switchboard and earthing upgrades for homes, strata and commercial buildings, by accredited Level 2 electricians.

  • Accredited Level 2 ASP (No. 3898, Classes 2A to 2D)

  • Mains, switchboard and earthing done together by one team

  • Strata upgrades in about 2 days, with power back on at the end of each day

  • Network approvals handled for you

  • Homes, strata and commercial buildings

  • Free quotes

What’s Included

One accredited team for everything from the network connection to your switchboard.


Consumer mains upgrade

New mains cabling sized for your building's load, from the connection point to the switchboard.


Strata and multi-unit

Main switchrooms, unit sub-mains and meter panels for strata buildings.


Main switchboard upgrade

Old fuse boards replaced with a modern switchboard, safety switches and room to grow.


Network approvals

We lodge and manage the paperwork with Ausgrid or Endeavour Energy.


Earthing upgrade

Earthing brought up to current standards, recommended with every mains upgrade.


Testing and certification

Tested, certified and handed over with the network notified.

Upgrades Built Around Strata Buildings

We know residents can't be without power for days. Strata mains upgrades usually take about 2 days, and we restore power at the end of each day. Outages are planned and confirmed with your strata manager in advance, with notices for residents.

Signs You Need a Upgrade

  • Your switchboard still has old ceramic fuses

  • Power trips when several appliances run at once

  • You're adding EV chargers, air conditioning or solar

  • Your building has received a defect notice

  • You're renovating or adding units

  • Your strata building's mains are decades old

How a 3-Phase Upgrade Works

  1. Site assessment and free quote
    We check your supply and switchboard and give you a fixed price.

  2. Network application
    We lodge the application with Ausgrid or Endeavour Energy. Approval usually takes 5 to 10 business days.

  3. Works scheduled
    We book the outage and arrange your new meter.

  4. Upgrade
    Mains, meter and switchboard are upgraded, usually in 1 to 2 days on site. Your power is only off for part of the day.

  5. Test and sign-off
    We test, certify and notify the network.


Why Choose Glenco

Accredited and authorised

ASP Level 2 Accreditation No. 3898, Classes 2A to 2D.

Multi-trade experts since 1988

Family-owned, NECA member since 1990 and Master Builders member.

We handle the network

Applications, notifications and bookings with Ausgrid and Endeavour Energy.

One contractor, start to finish

Level 2, general electrical, switchboards and building make-good works.

3-Phase Upgrade FAQs

Related Level 2 Services

3-Phase Power Upgrades

Metering Services

All Level 2 Services

Complete the form with a few details about your project. Our friendly service team will get back to you as soon as possible.

24/7 Emergency Electrician
Call us on 02 9700 9996

Get In Touch