3-Phase Power Upgrades Sydney

Need more power for an EV charger, ducted air conditioning, a heat pump or commercial equipment? Glenco's accredited Level 2 electricians upgrade homes and businesses across Sydney from single to 3-phase supply. We handle the network approvals, mains, metering and switchboard work from start to finish.

Single to 3-phase supply upgrades for homes and businesses, by accredited Level 2 electricians.

  • Accredited Level 2 ASP (No. 3898, Classes 2A to 2D)

  • Network approvals handled for you

  • Meter arranged with your retailer on your behalf

  • Most upgrades completed within 1 to 2 weeks

  • Residential and commercial properties

  • Free quotes

What’s Included

Everything needed to move your property from single to 3-phase supply, managed by one accredited team.


Supply and load assessment

We check your current supply, switchboard and planned equipment to confirm 3-phase is right for you.


Meter upgrade

We arrange the new 3-phase meter through your retailer, so you don't have to.


Network application

We lodge and manage the application with Ausgrid or Endeavour Energy.


Switchboard and earthing

If your switchboard can't handle 3-phase, we upgrade it, including the earthing.


Consumer mains upgrade

New mains cabling sized for 3-phase supply.


Testing and energising

Tested, certified and switched on, with the network notified.

3-Phase power for Homes and Businesses


More power for EV chargers, ducted air conditioning, heat pumps, pools and larger solar and battery systems, so everything can run at once without tripping.

For Homes


Workshops, commercial kitchens, offices, retail and light industrial sites running machinery, HVAC or EV fleet charging. We upgrade commercial supply across Sydney, with outages planned and confirmed with you in advance.

For Businesses

  • You're installing an EV charger

  • You're adding ducted air conditioning or a heat pump

  • You're installing a larger solar or battery system

  • You're running workshop machinery or commercial equipment

  • Your power trips or lights dim when appliances run together

Signs You Need a 3-Phase Upgrade

How a 3-Phase Upgrade Works

  1. Site assessment and free quote
    We check your supply and switchboard and give you a fixed price.

  2. Network application
    We lodge the application with Ausgrid or Endeavour Energy. Approval usually takes 5 to 10 business days.

  3. Works scheduled
    We book the outage and arrange your new meter.

  4. Upgrade
    Mains, meter and switchboard are upgraded, usually in 1 to 2 days on site. Your power is only off for part of the day.

  5. Test and sign-off
    We test, certify and notify the network.


From quote to completion, most upgrades take 1 to 2 weeks.

Why Choose Glenco

Accredited and authorised

ASP Level 2 Accreditation No. 3898, Classes 2A to 2D.

Multi-trade experts since 1988

Family-owned, NECA member since 1990 and Master Builders member.

We handle the network

Applications, notifications and bookings with Ausgrid and Endeavour Energy.

One contractor, start to finish

Level 2, general electrical, switchboards and building make-good works.

3-Phase Upgrade FAQs

Related Level 2 Services

Switchboard & Consumer Mains Upgrades

Metering Services

All Level 2 Services

Complete the form with a few details about your project. Our friendly service team will get back to you as soon as possible.

24/7 Emergency Electrician
Call us on 02 9700 9996

Get In Touch