Complete Level 2 ASP Infrastructure Upgrade

Eliminating a critical safety risk through a complete Level 2 ASP infrastructure upgrade

The Challenge: The property's electrical supply relied on a private pole attached to a deteriorating wall, at genuine risk of collapse. The infrastructure was non-compliant, presented a serious electrocution hazard, and detracted from the appearance of the building. Left unresolved, a pole or wall failure could have caused significant harm and damage.

  • Significant safety risk of electrocution and damage

  • Non-compliant electrical infrastructure

  • Poor visual presentation of the building

  • If left unresolved, the pole and wall could collapse causing serious harm and damage.

An electric meter panel with multiple meters installed on a wooden board, with some switches and labels above and around the meters.
Electrical wiring mess in an unfinished wall, with tangled wires, circuit connectors, and exposed wiring.
Electrical wiring mess in an unfinished wall, with tangled wires, circuit connectors, and exposed wiring.
Close-up of electrical wiring and conduit near a brick wall, with some rust and corrosion visible.

SCOPE OF WORKS

  • New underground service main

  • Underground to Overhead (UGOH) network connection

  • Private pillar installation

  • Consumer mains and smart metering upgrade

  • Meter panel relocation

  • Earthing system upgrade

Glenco designed and delivered a complete Level 2 ASP solution to remove the risk and modernise the property's electrical infrastructure. Works were carefully planned around existing gas, sewer and stormwater services using non-invasive excavation, with all Council permits, traffic management and full roadway reinstatement handled by our team.

The Solution

Multiple electric meters and circuit breakers mounted on a black board next to white electrical boxes on a wall.

A safe, compliant and future-ready electrical supply that improves the safety, reliability and appearance of the property. The changeover was completed in a single day, keeping disruption to residents to a minimum.